SMART HOME SYSTEM, GAS HEATING, AND SOLAR PANELS FOR SAVING YOUR FINANCES IN ALANYA!
IT'S NOT A JOKE – IT'S OUR NEW PROJECT ON THE DESIGNER LANDSCAPE TERRITORY WITH AN AREA OF 8,000 M2, INCLUDING 1,500 M2 FOR RESIDENTIAL BLOCKS AND 6,500 M2 FOR GREEN AREAS, THERE WILL BE 4 BLOCKS OF 5 FLOORS EACH.
THE COMPLEX CONSISTS OF A TOTAL OF 92 APARTMENTS, AND FROM THE FIRST FLOOR, THERE IS A SEA AND CITY VIEW.
46 UNITS OF 1+1 APARTMENTS FROM 54 M2
2 UNITS OF 1+1 APARTMENTS WITH PRIVATE GARDEN AND SWIMMING POOL FROM 51 M2
6 UNITS OF 2+1 LINEAR APARTMENTS FROM 81 M2
4 UNITS OF 3+1 APARTMENTS WITH SEPARATE KITCHEN, PRIVATE GARDEN, AND SWIMMING POOL FROM 135 M2
2 UNITS OF 5+1 DUPLEX APARTMENTS FROM 203 M2
DISTANCE TO THE SEA: 3,500 M
TRANSFER TO THE SEA;
SOUND AND HEAT INSULATED WALLS INSIDE AND OUTSIDE;
TWO ELEVATORS FOR 10 PEOPLE IN EACH BLOCK;
ON THE 8,000 M2 PLOT: 6,500 M2 OF GREEN GARDEN WITH INFRASTRUCTURE;
A 2-STOREY SOCIAL ZONE SEPARATED FROM THE BUILDINGS;
ELECTRIC PANELS INSTALLED ABOVE THE SOCIAL ZONE TO REDUCE THE ELECTRICAL LOAD FOR LIGHTING AND HEATING OF THE SOCIAL ZONE ON OUR ENTIRE PLOT AND LOWER THE MAINTENANCE FEE;
YOU CAN HEAT THE APARTMENT OR USE NATURAL GAS FOR YOUR COOKING THROUGH THE NATURAL GAS SYSTEM.
EACH APARTMENT WILL HAVE A METER TO TRACK THE CONSUMPTION;
IRRIGATION WELLS FOR GREEN PLANTATIONS;
OPEN SWIMMING POOL WITH A 1,000 M2 AREA, EQUIPPED WITH A REST AREA, JACUZZI, CHILDREN'S POOL, AND WATER PARK;
PRIVATE CLOSED PARKING;
ELECTRIC VEHICLE CHARGING STATION FOR EACH APARTMENT;
TRANSITION FROM THE CLOSED PARKING AREA TO THE SOCIAL ZONE;
SPECIAL OPEN PARKING AREA FOR YOUR GUESTS;
UNDERFLOOR HEATING IN SOCIAL ZONES;
A 130 M2 ROOM WITH AN INDOOR POOL;
A 60 M2 INDOOR POOL AND JACUZZI;
HAMMAM; SAUNA; SALT ROOM; STEAM BATH; MASSAGE ROOM; RELAXATION ROOM; 24/7 SECURITY; VIDEO SURVEILLANCE SYSTEM; CAFE; CINEMA THEATER; GYM; CHILDREN'S PLAYROOM; PLAYROOM WITH PLAYSTATION; MUSIC ROOM; CHILDREN'S PARK; BARBECUE AREA; SEPARATE REST AREAS IN THE GARDEN; PRIVATE BEACH;
START OF CONSTRUCTION: DECEMBER 2022;
COMPLETION OF CONSTRUCTION: DECEMBER 2024;
INTEREST-FREE INSTALLMENT PLAN UNTIL THE END OF CONSTRUCTION WITH AN INITIAL PAYMENT OF 40% OF THE SELECTED APARTMENT'S VALUE.