The ongoing project on the land area of 8,100 m2, will consist of 3 blocks. Each block will have 14 floors.
Blocks A and C will consist of 2+1 units, while Block B will consist of 1+1 units.
General characteristics:
- Natural gas system
- Thermal-resistant pumice used
- Smart elevator system
- Full generator
Interior features:
- Suspended ceiling
- Kitchen cabinets
- Hallway closet
- Bathroom cabinet
- Kitchen countertop
- Steel entrance door
- PVC windows with double glazing
- Imported silicone-based paint
- High-quality plumbing fixtures
- First-class shower cabin
- 10mm laminate flooring
- Glass balcony railings
- Kitchen trio (kitchen appliances set)
- Wardrobe
- TV wall unit
Social zone features:
- Open swimming pool
- Open parking area
- Open children’s playground
- Gazebos
- Indoor sports hall
- Sauna
- Turkish bath (hamam)
- Construction Start: 30th September 2022
- Construction Completion: 30th August 2024